图片名称
We are a manufacturer producing excavator swing gearbox and final drive (travel reduction ) since 1995 in Tianjin China.

图片名称
Lead time:Generally 1)Stock in hand: 2-3 work days for processing and packing. 2)Bulk production: 10-20 work days depend on the quantity.Packing:1)Outer packing: For assembly generally in white plywood case with steel edge fumigation-free. For spare parts with carton depends on size. 2)Inter packing: Wrap with shrink film or by plastic film. Label for each item clearly. 3)Customized Logo: For batch orders, if you have a legal brand, we are able to cast your Logo on the products and print it on the plywood cases after receiving the authorization letter. 4)We can also supply neutral packing for batch order as per your request for re-production parts not directly from stock supply.

图片名称
If you need spare parts, please send us the OEM-number or model. We use industry leading software to cross reference part number. We can also provide drawings and picture to check out goods dimension parameter. OUR e-commerce system (ERP) ensures swift organization without wasting any time whilst perfectly integrating the automated inventory data and technology file into a single business process.

Share your needs with us and we will contact you as soon as possible.

Submission

The main development, production of imported and domestic excavator rotary, walking reducer assembly and spare parts

All
  • All
  • Product Management
  • News
  • Introduction
  • FAQ
  • Enterprise Video